Application of hydrogen backup power system in construction sites
Publisher: 创始人 Release time: 2025-04-21 Number of views: 0

Due to its ability to output standard three-phase alternating current (AC 380V), the hydrogen generator can be used to charge all electrical equipment installed on construction sites, and its unit power of 120 kVA enables it to meet the electricity needs of most customers. When higher power is required by customers, multiple machines can be connected in parallel to meet the requirements of all electricity usage scenarios.

Previous article: No More